We use cookies

We use essential cookies to make this site work. With your consent, we may also use analytics cookies to understand how you use our site and improve your experience. Read our Cookies Policy.

RARE Heating & Plumbing Services · 85 Great Portland Street, London W1W 7LT · ICO registered · GDPR compliant

Real Projects. Real Results.

Case Studies — RARE Plumbing London

These case studies document real plumbing and heating projects completed by RARE across prime Central London postcodes — including boiler installations, full central heating system replacements, underfloor heating, commercial plant room upgrades, Legionella compliance and smart thermostat installations. Each entry describes the specific problem, the technical solution and the verified outcome.

Mayfair, Hampstead, Knightsbridge, Belgravia, Marylebone, St John's Wood and surrounding prime London areas.

Vaillant ecoTEC Plus Installation — Mayfair Townhouse — Mayfair, W1K case study by RARE Plumbing London
Boiler InstallationGrosvenor Square, Mayfair, W1KGrade II Listed Townhouse

Vaillant ecoTEC Plus Installation — Mayfair Townhouse

A 15-year-old Worcester Bosch boiler in a five-storey Mayfair townhouse was failing repeatedly. RARE replaced it with a Vaillant ecoTEC Plus 30kW in a single day — including a full power flush, magnetic filter and Heatmiser NeoHub 2 upgrade. The client now has a 10-year warranty, zero sludge contamination and seamless app-based heating control across four independent zones.

1 dayMarch 2025
Read More
Heatmiser NeoHub Multi-Zone Installation — Marylebone — Marylebone, W1U case study by RARE Plumbing London
Smart ThermostatsHarley Street, Marylebone, W1UGeorgian Townhouse

Heatmiser NeoHub Multi-Zone Installation — Marylebone

A six-bedroom Georgian townhouse in Marylebone was heating 14 separate rooms from a single, ancient Honeywell programmer — with no zonal control at all. RARE installed a complete Heatmiser NeoHub 2 system with 14 independent zones, app access across three devices, and individual room schedules tailored to the household routine. Energy bills dropped by an estimated 25–30% within the first month.

2 daysJanuary 2025
Read More
Megaflo Cylinder Replacement — Knightsbridge — Knightsbridge, SW1X case study by RARE Plumbing London
Plumbing & Hot WaterPont Street, Knightsbridge, SW1XLateral Apartment

Megaflo Cylinder Replacement — Knightsbridge

A Knightsbridge client arrived home on a Friday evening to water pooling around the base of the airing cupboard and no hot water. RARE diagnosed a catastrophically failed Megaflo expansion vessel, sourced a replacement 210-litre Heatrae Sadia Megaflo Eco that evening, and had it installed and commissioned by Saturday afternoon — navigating extremely restricted access without a single scratch to the surrounding fixtures.

1 dayFebruary 2025
Read More
Full UFH Installation — Hampstead Extension — Hampstead, NW3 case study by RARE Plumbing London
Underfloor HeatingFrognal, Hampstead, NW3Victorian Detached House

Full UFH Installation — Hampstead Extension

A Victorian detached house in Hampstead gained a 120m² ground floor extension with architect-specified wet underfloor heating across 8 independent zones. RARE designed the system, confirmed the existing Vaillant boiler had the capacity, installed a low-profile 18mm overlay system to protect ceiling heights, and integrated everything with the existing Heatmiser NeoHub — bringing the total property to 12 independently controlled zones.

4 daysNovember 2024
Read More
Commercial Plant Room Upgrade — Belgravia — Belgravia, SW1W case study by RARE Plumbing London
Commercial BoilersEaton Square, Belgravia, SW1WResidential Block — 8 Apartments

Commercial Plant Room Upgrade — Belgravia

A prestigious Belgravia residential block was running on two Potterton commercial boilers from the early 2000s — both failing intermittently, parts increasingly unavailable. RARE specified twin Viessmann Vitodens 200W 49kW boilers in cascade, reconfigured the primary pipework, installed a new pressurisation unit, and completed Gas Safe certification — all within three days, with partial heating maintained to all eight apartments throughout.

3 daysOctober 2024
Read More
Full System Power Flush — Primrose Hill — Primrose Hill, NW1 case study by RARE Plumbing London
Power FlushingFitzroy Road, Primrose Hill, NW1Victorian Terraced House

Full System Power Flush — Primrose Hill

Two winters of cold radiators, one boiler service from another company that missed the real problem entirely. RARE's water quality test confirmed the diagnosis immediately: severe magnetite sludge throughout the entire primary circuit. A full 16-radiator MagnaCleanse power flush cleared the system in a single day. Every radiator in the house was hot by evening.

1 dayApril 2025
Read More
Worcester Bosch Greenstar Installation — Notting Hill — Notting Hill, W11 case study by RARE Plumbing London
Boiler InstallationLadbroke Grove, Notting Hill, W11Four-Storey Townhouse

Worcester Bosch Greenstar Installation — Notting Hill

A cracked heat exchanger meant a Gas Safe engineer had to condemn the existing Baxi boiler on a Thursday morning in February — leaving five bedrooms and four floors without heating. RARE specified a Worcester Bosch Greenstar 8000 Life 30kW, planned an entirely new compliant flue route around a rear extension, and had the property fully heated again by Friday evening, with a 12-year warranty registered and a Tado smart thermostat configured.

1 dayFebruary 2025
Read More
Daikin Multi-Room AC Installation — South Kensington — South Kensington, SW7 case study by RARE Plumbing London
Air ConditioningOnslow Square, South Kensington, SW7Mansion Block Apartment

Daikin Multi-Room AC Installation — South Kensington

A high-net-worth client in a South Kensington mansion block needed air conditioning across four rooms — but the building management company would accept no visible pipework on the primary facade, no units visible from the street, and required pre-approval for all external works. RARE specified a Daikin 5MXM90 multi-split system, secured building management approval before a single tool was lifted, routed all pipework internally or through service voids, and completed the two-day installation with zero visible trunking in any living space.

2 daysMay 2025
Read More
Full Central Heating System Upgrade — Belsize Park — Belsize Park, NW3 case study by RARE Plumbing London
Central HeatingBelsize Avenue, Belsize Park, NW3Edwardian Semi-Detached

Full Central Heating System Upgrade — Belsize Park

A full renovation of a five-bedroom Edwardian semi in Belsize Park demanded a complete central heating system replacement — new ATAG boiler, 18 designer radiators in a custom RAL colour, two-zone Heatmiser controls, and all ground floor pipework concealed in service voids to meet the architect's brief. RARE were involved from design stage through to commissioning, and the installation was completed in five days without a single specification error.

5 daysMarch 2025
Read More
Commercial PPM Contract — Mayfair Members Club — Mayfair, W1J case study by RARE Plumbing London
Commercial BoilersBerkeley Square, Mayfair, W1JPrivate Members Club

Commercial PPM Contract — Mayfair Members Club

A prestigious Mayfair private members club needed to replace their long-standing maintenance contractor. RARE put together a bespoke commercial PPM contract covering quarterly boiler services, monthly plant room inspections, bi-annual Legionella monitoring, annual Gas Safety certificates and a 4-hour emergency response guarantee — all delivered with the discretion and professionalism the club's environment demands.

Ongoing PPMJanuary 2025
Read More
Viessmann Vitodens 100W Installation — Pimlico — Pimlico, SW1V case study by RARE Plumbing London
Boiler InstallationWarwick Square, Pimlico, SW1VVictorian Flat Conversion

Viessmann Vitodens 100W Installation — Pimlico

A Pimlico solicitor's boiler failed beyond repair the week before Christmas. Access was through a narrow utility corridor. RARE specified a Viessmann Vitodens 100W for its compact footprint and quiet operation, installed and commissioned it in a single day, and had heating and hot water restored before Christmas — with a 10-year warranty registered and a new Heatmiser NeoStat thermostat configured.

1 dayDecember 2024
Read More
Concealed Leak Detection & Repair — Marylebone — Marylebone, W1G case study by RARE Plumbing London
Plumbing & Hot WaterWelbeck Street, Marylebone, W1GHigh-Spec Rental Apartment

Concealed Leak Detection & Repair — Marylebone

A Marylebone rental flat had a slow concealed leak causing water damage to the flat below. The bathroom floor had recently been tiled with expensive Italian porcelain. RARE used acoustic detection equipment to pinpoint the leak exactly, removed just five tiles, repaired the compression joint failure beneath the screed, matched the original tile, and left the floor looking indistinguishable from the day it was laid.

2 daysApril 2025
Read More
Gas Safety Certificate Portfolio — West Hampstead Landlord — West Hampstead, NW6 case study by RARE Plumbing London
Plumbing & Hot WaterWest End Lane, West Hampstead, NW68-Property Rental Portfolio

Gas Safety Certificate Portfolio — West Hampstead Landlord

Annual Gas Safety certificates across a portfolio of 8 rental properties in West Hampstead and Hampstead — all coordinated, completed and delivered in two days, with tenant communication handled entirely by RARE. Three properties needed minor remedial works, completed on the same visit. Every certificate was emailed to landlord and tenant the same day as the inspection. The landlord has since described it as the least stressful CP12 cycle he's experienced in 12 years of property management.

2 daysMarch 2025
Read More
ATAG One Boiler Installation — Belgravia — Belgravia, SW1X case study by RARE Plumbing London
Boiler InstallationChester Square, Belgravia, SW1XSix-Storey Townhouse

ATAG One Boiler Installation — Belgravia

A six-storey Belgravia townhouse with a master bedroom directly above the boiler cupboard needed the quietest possible combi boiler replacement. RARE specified an ATAG One 25 — one of the lowest-noise wall-mounted boilers available in the UK — and installed it in a single day, with a Heatmiser NeoHub 2 upgrade and five-zone recommissioning. The client confirmed it was inaudible from the room above.

1 dayApril 2025
Read More
Heatmiser NeoHub Installation — Hampstead Heath — Hampstead, NW3 case study by RARE Plumbing London
Smart ThermostatsRedington Road, Hampstead, NW3Five-Bedroom Detached House

Heatmiser NeoHub Installation — Hampstead Heath

A Hampstead homeowner had a five-bedroom house with five separate heating zones and five separate programmers — one per zone, none of them synchronised and none accessible remotely. RARE consolidated the entire system onto a single Heatmiser NeoHub 2 with five NeoStat thermostats, floor sensors on the ground floor timber zone, and full app control across the household's devices. The house now runs from one app, with independent schedules per zone and remote access from anywhere.

1 dayMay 2025
Read More
Lateral Apartment Power Flush & System Rebalance — Knightsbridge — Knightsbridge, SW3 case study by RARE Plumbing London
Power FlushingCadogan Place, Knightsbridge, SW3Lateral Apartment — 8 Rooms

Lateral Apartment Power Flush & System Rebalance — Knightsbridge

A Knightsbridge lateral apartment had a complete power flush and system rebalance following a boiler service that flagged severe water quality issues. Eight radiators across the apartment were partially blocked with magnetite sludge — three were barely warm. RARE carried out a full MagnaCleanse flush, fitted a Fernox magnetic filter and rebalanced the system. Every radiator in the apartment was at full temperature by early afternoon.

1 dayMarch 2025
Read More
Legionella Risk Assessment & Tank Cleaning — St John's Wood Estate — St John's Wood, NW8 case study by RARE Plumbing London
Legionella & Water ComplianceAvenue Road, St John's Wood, NW8Private Estate — 4 Properties

Legionella Risk Assessment & Tank Cleaning — St John's Wood Estate

A private estate manager received a compliance notice from their insurers requiring current Legionella risk assessments and tank cleaning records across all four properties under their management. RARE completed ACoP L8 compliant risk assessments, tank inspections, deep cleaning, biocidal disinfection and water quality testing across all four properties in a single day — and delivered exactly the documentation the insurers required.

1 daySeptember 2024
Read More
Electric Boiler Replacement — Marylebone Mansion Flat — Marylebone, W1U case study by RARE Plumbing London
ElectricalDevonshire Place, Marylebone, W1UGrade II Listed Mansion Flat

Electric Boiler Replacement — Marylebone Mansion Flat

A Grade II listed mansion flat in Marylebone had been running on a 22-year-old Heatrae Sadia electric boiler that was beyond economical repair — intermittent heating, rising energy bills and no spare parts available. RARE specified a modern EHC electric combi boiler, navigated the listed building constraints on flue-free installation, upgraded the electrical supply to handle the new load, and had the flat fully heated within a single day — with no gas certification required and a 5-year warranty registered.

1 dayJune 2025
Read More
Plant Room Rebuild — Oversized Boiler System Downsized for Efficiency — London case study by RARE Plumbing London
Boiler InstallationLondonProperty with Plant Room & Underfloor Heating

Plant Room Rebuild — Oversized Boiler System Downsized for Efficiency

A London property's plant room had two Keston 55kW boilers — 110kW of combined output that was significantly oversized for the actual heat demand. RARE rebuilt the plant room with a correctly sized 45kW + 30kW Keston system, reconfigured all pipework for proper zoning, and cleaned up the system operations. The property now has even heating and hot water temperature, independent control of underfloor heating and hot water, and measurably lower gas consumption.

Multi-dayAugust 2026
Read More
Ohme Home Pro EV Charger — Mayfair Townhouse — Mayfair, W1K case study by RARE Plumbing London
EV Charger InstallationMount Street, Mayfair, W1KGrade II Listed Townhouse

Ohme Home Pro EV Charger — Mayfair Townhouse

A Mayfair townhouse owner needed an EV charger for a new Porsche Taycan but had a listed building facade, a shared service entrance, and a 100-year-old electrical supply that needed assessing for capacity. RARE installed an Ohme Home Pro with dynamic load balancing, ran all cabling through existing service voids with zero visible surface mounting, and protected the listed interior throughout with full dust sheets, floor protection and corner guards.

1 dayJune 2025
Read More
18th Edition Consumer Unit Upgrade — Hampstead Victorian Home — Hampstead, NW3 case study by RARE Plumbing London
Consumer Unit UpgradeChurch Row, Hampstead, NW3Victorian Terraced House

18th Edition Consumer Unit Upgrade — Hampstead Victorian Home

A Hampstead family had a 25-year-old rewireable fuse board with no RCD protection — a serious safety risk in a home with young children. RARE replaced it with a full 18th Edition (Amendment 2) consumer unit with surge protection, individual RCBOs for every circuit, and a dedicated EV-ready spare way. The original parquet flooring and hallway were fully protected throughout, and the client received a full EICR certificate the same day.

1 dayMay 2025
Read More
EICR & Remedial Works — Marylebone Rental Portfolio — Marylebone, W1U case study by RARE Plumbing London
EICR & SafetyBaker Street, Marylebone, W1U6-Property Rental Portfolio

EICR & Remedial Works — Marylebone Rental Portfolio

A Marylebone landlord with six rental properties needed EICR certificates before tenancy renewals — and had been let down by two previous contractors who issued unsatisfactory reports and then didn't return to do the remedial works. RARE completed all six EICRs, identified and repaired every code C1 and C2 fault on the same visit, and delivered satisfactory certificates for all six properties within three days. The landlord described it as the smoothest compliance cycle he had ever experienced.

3 daysApril 2025
Read More
Full Electrical Rewire — Belgravia Apartment Renovation — Belgravia, SW1X case study by RARE Plumbing London
Electrical InstallationEaton Place, Belgravia, SW1XLateral Apartment

Full Electrical Rewire — Belgravia Apartment Renovation

A full-scale renovation of a Belgravia lateral apartment required a complete electrical rewire — new circuits throughout, smart lighting control, a dedicated AV rack, and a future-proofed network backbone. RARE were involved from design stage, coordinated with the main contractor and interior designer, and completed the eight-day installation with a level of home protection that the client said she had never seen on any previous project. Every surface was protected, every cut was vacuumed, and the apartment was left spotless at the end of each day.

8 daysMarch 2025
Read More
Zappi EV Charger + Solar Integration — Hampstead Eco Home — Hampstead, NW3 case study by RARE Plumbing London
EV Charger InstallationTemplewood Avenue, Hampstead, NW3Contemporary Eco House

Zappi EV Charger + Solar Integration — Hampstead Eco Home

A Hampstead homeowner with a 6kW solar PV array and a home battery wanted to charge their EV from surplus solar — not from the grid. RARE specified and installed a myenergi Zappi 7kW charger with solar diversion, integrated it with the existing PV system and battery storage, and configured it to prioritise self-generated renewable energy. The client now charges their EV at no cost during sunny periods, with automatic fallback to off-peak grid power when solar is insufficient.

2 daysJuly 2025
Read More
Emergency Consumer Unit Replacement — Notting Hill — Notting Hill, W11 case study by RARE Plumbing London
Emergency ElectricalLansdowne Road, Notting Hill, W11Victorian Conversion Flat

Emergency Consumer Unit Replacement — Notting Hill

A Notting Hill flat owner called at 9pm on a January evening after hearing a buzzing sound from the consumer unit and smelling burning plastic. RARE's emergency electrician was on site within 90 minutes, identified a catastrophic connection failure on the main switch, isolated the supply safely, and had a new 18th Edition consumer unit installed and certified by 1am. The client was back with power and heat before the end of the night — and the burnt unit was documented for insurance purposes with detailed photographs.

4 hoursJanuary 2025
Read More

Ready to become our next success story?

Gas Safe registered. Transparent pricing. White glove finish. Available 24/7 across Central and North West London.